Commercial Projects

2019 | Albuquerque, NM

Budget: $2,492,203

Size: 9150 square foot adaptive reuse | 575 square foot addition


2016 | Albuquerque, NM

Budget: $168,290

Size: 250 square foot renovation | 85 square foot addition


2016 | Tijeras, NM

Budget: $302,721

Size: 1060 square foot


US General Services Administration Projects

2015 - 2019 | Albuquerque, NM | Santa Fe, NM | Gallup, NM | Midland, TX

I managed 6 projects for the GSA while working at Sam Sterling Architecture. (3) design projects, (2) construction administration projects, and (1) feasibility study and assisted in the design and construction administration of several others.

These projects involved interfacing with tenant government agencies including:

The US Marshals Service, US District Courts, US Bankruptcy Courts, US Postal Service, US Probation Courts, Pretrial services, the Bureau of Land Management, Customs and Border Patrol, and the Food and Drug administration


2019 - Current | Albuquerque, NM | Livermore, CA

I have managed numerous small renovations, tenant improvements, and systems upgrade projects for Sandia National Laboratories at both their Albuquerque and Livermore campuses as well as assisting in design and documentation for (4) new construction projects.

Sandia National Laboratories Projects

Multi-Use Housing

The renovations to the late 19th century theater building at Coal and 2nd street are part of a masterplan to develop two adjacent lots next to the railroad tracks. When complete the Orpheum Community Hub will house the new headquarters for the affordable housing non-profit Homewise, apartments on the second and third floors, and a black box theater and teaching space.

Playing a secondary roll in the master planning phase I and my co-pm managed the project through all phases of design and construction administration.

Orpheum Entry View.jpg
Orpheum From the Parking Lot.jpg
Orpheum Interior Rendering.jpg

Space to Let your Hair Down

This new addition to Betty’s enables couples treatments, bridal parties, and other group bookings. The space includes a treatment room, a lounge, a steam shower, and an exterior patio screened from the street. Due to the quiet, individual experience of the rest of the spa acoustical separation was extremely important for this project.

I assisted with the production of drawings at all phases and wrote technical specifications for the project.

Bettys 10_Small.jpg
Bettys 12.jpg
Bettys 15.jpg
Bettys day 2 03.jpg

East Mountain Transfer Center Office

Replacing an existing single-wide trailer the new office for the Bernalillo County East Mountain Transfer Center consists of a break room / training area, the overseers office, and a vehicle maintenance area.

Although I had no hand in managing this project I was heavily involved in design and documentation throughout the process.

IMG_3666.JPG